Aukett Swanke Group - Interim Results
Released
Released
Announcement PDF
RNS Number : 9625D
Aukett Swanke Group PLC
27 June 2023
Aukett Swanke Group Plc
("Aukett Swanke", the "Company", or, together with its subsidiaries, the "Group")
Interim results
For the six months ended 31 March 2023
Aukett Swanke (AIM: AUK), the group providing Smart Buildings, Architectural and Design Services,
is pleased to announce its interim results for the six-month period ended 31 March 2023.
Highlights
-
Revenue from continuing operations increases to £4.56m (2022: £4.53m)
-
Revenue less sub consultant costs increases to £4.40m (2022: £3.38m)
-
United Kingdom increases profit before group costs to £130k (2022: £40k)
-
Continental Europe increases profit before group costs to £257k (2022: £123k)
-
Loss for the period £0.48m, impacted by one-off Torpedo Factory Group ("TFG")
acquisition costs
-
Improving markets & strengthening order book
-
Ranked 48 th largest firm by number of UK architects (up from 70 th) in the AJ100
-
Acquisition of TFG just before period end to expand Smart Buildings strategy and broaden
asset base and revenue streams
-
Appointment, today, of Freddie Jenner to the board as Chief Operating Officer
Commenting, Chief Executive Nick Clark said, "I am thrilled to have been appointed as Chief
Executive, and excited by our mission creating a UK-listed Smart Buildings group. Against a
backdrop of improving trading performance, I look forward to reporting on our progress in the
coming months."
Contacts
Aukett Swanke Group Plc
Clive Carver, Chairman
+44 (0) 20 7843 3000
Nick Clark, Chief Executive
Strand Hanson Limited, Financial and Nominated Adviser
+44 (0) 20 7409 3494
Richard Johnson, James Bellman
Zeus Capital Limited, Broker
+44 (0) 20 3829 5000
Simon Johnson, Louisa Waddell
Investor/Media
+ 44 (0) 7979 604 687
Chris Steele
An electronic version of the Interim Report will be available on the Group's website (www.aukettswankeplc.com).
Chairman's Statement
Introduction
I am pleased to present the interim results for the six months ended 31 March 2023.
At the end of the reporting period, we acquired Torpedo Factory Group ("TFG"), and welcomed
Nick Clark as Chief Executive. Further below he introduces the TFG businesses and describes in
more detail the concept of Smart Buildings, and how this is being incorporated into the Group's
strategy.
The evolution of architecture
We acquired TFG in March 2023, principally as a means of embracing the increasing use of
technology in the design, construction and management of buildings. We believe we are one of
the first in our profession to make such a move and look forward to developing a leading
presence in the Smart Buildings space, while continuing to develop our long established
architecture businesses.
The TFG acquisition also gave us access to further funding and has allowed us to transition key
senior management positions to the next generation, bringing the Board more into line with our
staff and clients generally.
Restructuring the architecture business completed
Restructuring work to improve the core profitability of our traditional architecture businesses is
now complete. The UAE business has been sold and the international offices, other than those in
Germany, have either been closed or are moving onto a licence basis with local management
being responsible for profitability.
Our core architecture businesses now comprise our design and executive architecture businesses
in the UK and our direct investments in the Berlin and Frankfurt practices.
As set out in greater detail in the report from the Chief Executive, we have experienced growth in
each of the core architecture markets necessitating the recruitment of 13 full time equivalent
additional architects in our UK operations since the beginning of the financial year, which places
the Group 48 th largest by number of UK employed architects, based on AJ100 compiled by
Architects' Journal. This is a rise from 70 th place last year.
Smart Buildings
The Group's approach to Smart Buildings is set out in detail in the accompanying Chief Executive's
report.
Board update
During the period under review and subsequently we have welcomed a number of new members
to the Board to help deliver the growth we seek in both the traditional architecture and the new
Smart Buildings businesses.
Nick Clark - Chief Executive
Nick, who was the founder and Chief Executive of TFG, became Group Chief Executive on
completion of the deal in April 2023. At the same time, Robert Fry, who had acted as interim chief
executive from December 2022 to April 2023, became Deputy Chairman on a part time basis,
with principal responsibility for the Group's international offices and the expansion of the
architecture businesses.
Freddie Jenner - Chief Operating Officer
Freddie has today been appointed to the Board as Chief Operating Officer. Freddie was previously
Chief Financial Officer at TFG, which he joined in 2007. Further details on his appointment are
being separately announced today.
Tandeep Minhas - Non-executive director
Tandeep Minhas, a leading corporate lawyer and head of the London corporate finance
department at international lawyers Taylor Wessing LLP, joined the Board as a non-executive
director on 24 April 2023.
Further details of your full Board can be found at https://aukettswankeplc.com/people/.
Long term incentives
To attract and retain the team required to deliver success we plan to introduce a new long term
incentive package. This will seek to better align the interests of shareholders generally and those
individuals on whose efforts the Group's future depends. A further announcement in this regard
will be made in due course.
Outlook
With the team in place and the strategy honed we look forward to reporting continued progress in
both our existing and acquired businesses.
Clive Carver
Chairman
26 June 2023
Chief Executive's report
Introduction
I am delighted to have been appointed as your new Chief Executive, and excited about the
opportunities ahead of us.
Following the acquisition of TFG, our mission is to develop our award-winning architecture
businesses and become a leading force in the provision of Smart building systems, which we
firmly believe to be a major growth area using technology to enhance the experience of buildings
owners and users.
Architects are the trusted advisors who are best placed to convince an inherently conservative
property industry that change is not only desirable, but essential. Our Group is therefore wellpositioned to exploit the opportunities in this transformative industry.
Architecture
Through architecture, we forge a profound connection between people and their surroundings. It
evokes a sense of place and fosters a sense of belonging. It pushes boundaries, challenging us to
envision a better future and to explore new possibilities for a more sustainable way of living.
Architecture also brings change with a spirit of optimism and renewal, which is at the heart of
what the Group needs to deliver.
Aukett Swanke Limited - UK architecture and interior design
Employed an average 35 full time equivalent ("FTE") technical staff in the 6 month period, with
revenue of £1.89 million (£1.81 million, net of sub consultant costs).
Aukett Swanke Limited is the Group's award-winning full design service architecture business,
which can trace its roots back over a century, and offers leading design services across a wide
range of sectors.
I am pleased to report progress with new contract wins during the period for a major
masterplanning project with Network Rail and a residential project for Ardmore at 8 Eaton Lane in
London.
Completions in the period include the St. Andrew's House apartments for Anglo American De
Beers, and new starts include the refurbishment of The Underwriting Room in the iconic Lloyd's
of London building.
Veretec - UK executive architecture
Employed an average 44 FTE technical staff in the 6 month period, with revenue of £2.30 million
(£2.28 million, net of sub consultant costs).
Veretec is our executive architecture business, which uses the division's technical and delivery
skills to translate the designs of others into high quality buildings.
This business also made strong progress in the period under review completing several projects
and winning others requiring a significant increase in staffing.
Following the period end, continued recruitment required to service new and existing contracts
increased FTE technical staff to 57 in May 2023.
New projects commenced in the period include the Town Hall and extension of the West King
Street Renewal project master planned by Rogers Stirk & Harbour and the Nine Elms School with
the IBI Group for Morgan Sindall.
Completions have included the n2Nova commercial office building designed by Patrick Lynch
Architects for Landsec and executed by Mace.
German investments
The Group owns a 25% investment in the Berlin practice Aukett + Heese GmbH, employing an
average 106 FTE technical staff in the 6 month period, with revenue of £8.62 million (£5.5 million,
net of sub consultant costs). The studio offers a full range of architectural design services and
holds a leading position in the regional market it serves.
The Group also owns a 50% investment in the Frankfurt practice Aukett + Heese Frankfurt GmbH
employing an average 10 FTE technical staff in the 6 month period, with revenue of £0.77 million
(£0.46 million, net of sub consultant costs). The studio is renowned for its architecture and interior
design expertise in the financial, corporate and high-rise building sectors in the local market.
The revenues of these investments are not consolidated in the Group's revenues as we do not
own a majority of either business.
Completions in Berlin included the opening of the Deutsche Bahn restaurant in the Sony Center,
renamed the Potsdamer Platz Center, and the commencement ceremony to break ground for the
42,000 sqm Siemensstadt Square project comprising two buildings, one high-rise, and 20,000
sqm of open space with public amenities.
Torpedo Factory Group
As set out in more detail in the financial commentary below, the results from the TFG audio visual
businesses are only included in these financial statements for the final 10 trading days in March
2023. However, to give shareholders a better understanding of the what the Group now enlarged
by the TFG acquisition offers we include the following information, which is based on a full 6
month period to 31 March 2023.
Meeting Environments
Employed an average 29 FTE staff in the 6 month period, with revenue of £1.93 million.
TFG's Meeting Environments business has been renamed Intelligent Environments to reflect our
broader work beyond meeting spaces as we reposition the business as a Master Systems
Integrator looking at workplace technologies more broadly.
Stage Technology
Employed an average 23 FTE staff in the 6 month period, with revenue of £1.38 million.
The Stage Technology business has an extensive client base in the UK's leading theatres,
universities, and schools in the private and state sectors. The current year is dominated by the
delivery of a major project, a landmark new venue in Manchester, which is due to complete by the
end of June.
Live Events
Employed an average 10 FTE staff in the 6 month period, with revenue of £0.55 million.
The Live Events business did not form part of the Group's Smart Buildings plans and was sold
with effect from 31 March 2023.
Smart Buildings
Why Smart Buildings
Smart Buildings enhance efficiency, sustainability, and occupant experience.
Smart Buildings integrate advanced technologies, data analytics, and automation to create vibrant
ecosystems. They optimise energy consumption, streamline operations, and personalise
experiences for occupants. By leveraging the Internet of Things (IoT) and artificial intelligence (AI),
Smart Buildings offer real-time monitoring, energy savings, improved comfort, proactive
maintenance, and cost reduction.
In contrast to a traditional architecture business, which has high fixed costs and where once the
project is completed there is no further income, under a Smart Buildings business model,
revenues are generated monthly throughout the lifetime of a building. Technology is used to its
utmost; rapid growth is achievable without the often time consuming and expensive recruitment
of additional staff; and short term fluctuations in economic activity do not dictate customer
buying decisions.
Market drivers
Regulation is likely to be a key driver in the growth of Smart Buildings.
For example, since April 2023, almost all commercial buildings in the UK are required to have an
Energy Performance Certificate (EPC) rating of E or better. Without such a rating they cannot be
rented to tenants. From 2027, this requirement rises to C, and by 2030, a rating of B or better will
be needed. Knight Frank recently estimated that 70% of the UK's commercial building stock fails
to comply with EPC B and landlords of such properties will need to invest in upgrading their
buildings.
Our Smart Buildings strategy
Our plan is to become a leading provider of Smart Building services. Breaking this down we need
to become:
·
Smart Building Systems Designers
·
Smart Building Systems Integrators
·
Smart Building Systems Operators
We intend to grow at pace; only a buy and build strategy can deliver the speed of change that we
intend to deliver.
Smart Building Systems Designers
I am pleased to report we have already made our first appointment in this new division and
expect to make further progress before the end of the current financial year.
Smart Building Systems Operators & Smart Building Systems Integrators
We are actively considering specific acquisition opportunities in the sector and we look forward to
updating shareholders on these and other potential acquisitions in due course.
Group Financial results
Basis of preparation
These interim statements, which cover the six months ended 31 March 2023, are unaudited and
include the full six months trading of the Aukett Swanke Group architecture businesses and the
final 10 trading days of the period from TFG.
The balance sheet as at 31 March 2023 includes both the Aukett Swanke Group architecture
businesses and the TFG businesses.
Overall assessment
While the performance across the architecture businesses as set out below is improving as the
result of new contract wins and the restructuring of the Group in previous periods, we are still a
long way from the level of profitability required to justify a meaningful Group valuation.
This demonstrates why the previous Aukett Swanke Group board recognised that a new approach
is needed.
Revenue
We consider revenue after subconsultant costs to be the most relevant performance indicator in
assessing the progress of the Group's architecture businesses.
In the six months under review, revenue after subconsultants costs grew by approximately 30% to
approximately £4.40 million, reflecting a general increase in activity.
Operating costs
To be able to service this increased activity and in preparation for work won but yet to start,
personnel costs increased by approximately 29% to approximately £3.78 million, with the
addition of 13 FTE fee earning technical staff in the UK operations during the 6 month period, and
the average FTE technical staff 14 higher than the comparable 6 month period in the period year.
Property related costs increased by 8% to approximately £0.57 million while other operating costs
more than doubled to approximately £0.61 million reflecting the greater level of activity.
Included in these costs are approximately £0.56 million group costs, excluding those relating to
the TFG acquisition.
Associates and joint ventures
The share of associates included in these interim financial statements grew from approximately
£0.07 million to approximately £0.21 million, reflecting their increased profitability.
Trading loss
The additional contribution from associates and joint ventures offset the additional personnel and
group costs to leave the trading loss at approximately £0.29m. This is slightly higher than in the
corresponding period last year, but also includes £0.09m of one-off costs relating to the
settlement of TFG employees company share option costs and the loss on assets disposed of as
part of the Live Events disposal.
Acquisition costs
The costs associated with acquiring TFG were approximately £0.26 million and increased the loss
before tax to approximately £0.55 million.
Balance sheet
While the trading impact of the TFG acquisition in these interim financial statements was minimal,
its impact on the closing balance sheet was more significant.
Plant, property and equipment increased from approximately £0.07 million to approximately
£3.22 million, almost all of which related to TFG assets, principally the main operating TFG site, a
freehold building valued at £3.02 million.
Similarly, trade and other receivables and stock increased from approximately £2.61 million to
approximately £4.84 million, again with most of the increase due to TFG.
Cash at bank at 31 March 2023 was approximately £0.81 million compared to just £0.04m at the
end of the corresponding prior period.
Borrowings increased from £0.58 million in the prior period to £3.12 million consolidating the
TFG CBILS loan of £1.17 million and £1.45 million mortgage on the freehold property.
TFG trading
Although largely excluded from these interim financial statements, we set out below a brief
assessment of TFG's trading in that period.
TFG's revenue for October 2022 to March 2023 was £3.86 million, 9.6% higher than in the
corresponding period in 2022. The underlying performance of the TFG businesses was just below
breakeven at EBITDA level, due in part to delays in a large project with more of the work on it
delivered in the current (April to June) quarter.
Live Events disposal
On 4 April 2023, two weeks after the purchase of TFG, the Group announced the disposal of TFG's
Live Events business. It was the part of the business most dramatically damaged by the
Government's pandemic restrictions. While it has been recovering well, it was non-core to the
Smart Buildings plan, and its need for investment will be better met outside of our Group. It was
personally painful to part ways with several colleagues I had worked with for many years, but it is
undoubtedly the right way forward for all concerned and I wish them well.
Current Trading & Outlook
Architecture
With a good stock of committed work and a growing team of chargeable staff across both
principal business areas, we expect the second half of the year to show an improvement on the
first half.
Torpedo Factory Group
Similarly, with strong project delivery, we expect the second half to be better than the first half.
The mortgage on TFG's freehold is due to be repaid in February 2024 and we are carefully
reviewing our options to refinance this facility.
Smart Buildings
As we are already almost 9 months into the current financial year, it is expected that it will be into
the 2023 / 24 financial year before we see material contributions from our Smart Buildings
businesses.
Our team
I am hugely appreciative to all our staff who have coped admirably with a period of significant
change.
We are committed to shaping a sustainable, exciting, and rewarding future for our clients and our
shareholders, and our staff and I look forward to sharing news our progress with you.
Nick Clark
Chief Executive
26 June 2023
Consolidated income statement
For the six months ended 31 March 2023
Note
Unaudited
six months
to 31 March
2023
£'000
Unaudited
six months
to 31 March
2022
£'000
Audited
year to
30 September
2022
£'000
4,562
4,529
8,645
Sub consultant costs
Revenue less sub consultant costs
(164)
4,398
(1,152)
3,377
(1,518)
7,127
Personnel related costs
Property related costs
Other operating expenses
Other operating income
(3,781)
(573)
(610)
129
(2,921)
(531)
(240)
144
(6,237)
(1,037)
(483)
326
Continuing Operations
Revenue
4
5
Operating loss
(437)
(171)
(304)
Finance costs
(55)
(46)
(95)
Loss after finance costs
(492)
(217)
(399)
Share of results of associate and joint ventures
205
65
327
Trading loss from continuing operations
(287)
(152)
(72)
Acquisition costs
Goodwill impairment
Loss before tax from continuing operations
(258)
(545)
(152)
(1,752)
(1,824)
54
(491)
26
(126)
45
(1,779)
7
(484)
(261)
(387)
(503)
(2,282)
(484)
(484)
(387)
(387)
(2,282)
(2,282)
(0.29p)
0.00p
(0.29p)
(0.07p)
(0.16p)
(0.23p)
(1.08p)
(0.30p)
(1.38p)
4
Tax credit
Loss from continuing operations
Profit/(loss) from discontinued operations
Loss for the period
6
Loss attributable to:
Owners of Aukett Swanke Group Plc
Non-controlling interests
Loss for the period
Basic and diluted earnings per share for
(loss)/profit attributable to the ordinary equity
holders of the Company:
From continuing operations
From discontinued operations
Total loss per share
7
Consolidated statement of comprehensive income
For the six months ended 31 March 2023
Unaudited
six months
to 31 March
2023
£'000
Unaudited
six months
to 31 March
2022
£'000
Audited
year to
30 September
2022
£'000
(484)
(387)
(2,282)
(1)
(42)
-
-
(7)
(209)
34
(7)
(168)
33
(49)
(384)
Total comprehensive loss for the period
(451)
(436)
(2,666)
Total comprehensive loss is attributable to:
Owners of Aukett Swanke Group Plc
Non-controlling interests
(451)
-
(436)
-
(2,666)
-
Loss for the period
Other comprehensive income:
Currency translation differences of foreign
operations
Currency translation differences on disposal
recycled to gain on disposal of discontinued
operation
Currency translation differences on translation of
discontinued operations
Other comprehensive gain/(loss) for the period
Total comprehensive loss for the period
(451)
(436)
(2,666)
Total comprehensive profit/(loss) attributable to
the owners of Aukett Swanke Group Plc arises
from:
Continuing operations
Discontinued operations
(492)
41
(168)
(268)
(1,786)
(880)
(451)
(436)
(2,666)
Consolidated statement of financial position
At 31 March 2023
Note
Non current assets
Goodwill
Other intangible assets
Property, plant and equipment
Right-of-use assets
Investment in associate and joint ventures
Loans and other financial assets
Deferred tax
Total non current assets
Current assets
Trade and other receivables
Inventories
Contract assets
Cash at bank and in hand
3
10
Assets in disposal groups classified as held for
sale
Total current assets
Total assets
Current liabilities
Trade and other payables
Contract liabilities
Borrowings
Lease liabilities
9, 10
Liabilities directly associated with assets in
disposal groups classified as held for sale
Total current liabilities
Non current liabilities
Trade and other payables
Borrowings
9, 10
Unaudited
at 31
March
2023
£'000
Unaudited
at 31
March
2022
£'000
Audited
at 30
September
2022
£'000
1,381
273
3,218
2,335
1,081
162
332
8,782
1,753
217
74
2,354
802
265
5,465
210
69
2,184
1,007
281
3,751
4,843
336
744
805
6,728
-
2,605
599
38
3,242
1,868
3,293
1,119
28
4,440
-
6,728
5,110
4,440
15,510
10,575
8,191
(4,978)
(1,720)
(2,258)
(537)
(9,493)
-
(2,497)
(802)
(289)
(539)
(4,127)
(1,006)
(3,169)
(1,227)
(482)
(457)
(5,335)
-
(9,493)
(5,133)
(5,335)
(858)
(292)
(44)
(167)
Lease liabilities
(1,961)
(2,118)
(1,962)
Deferred tax
Provisions
(183)
(256)
(37)
(364)
(33)
(249)
Total non current liabilities
(3,258)
(2,811)
(2,455)
Total liabilities
(12,751)
(7,944)
(7,790)
Net assets
2,759
2,631
401
Capital and reserves
Share capital
Merger reserve
Foreign currency translation reserve
Retained earnings
Other distributable reserve
2,753
2,884
(524)
(3,848)
1,494
1,652
1,176
(222)
(1,469)
1,494
1,652
1,176
(557)
(3,364)
1,494
Total equity attributable to
equity holders of the Company
2,759
2,631
401
Non-controlling interests
Total equity
2,759
2,631
401
Unaudited
six months
to 31 March
2023
£'000
Unaudited
six months
to 31 March
2022
£'000
Audited
year to
30 September
2022
£'000
328
-
(303)
99
(1,104)
99
328
(204)
(1,005)
Cash flows from investing activities
Purchase of property, plant and equipment
Acquisition of subsidiary, net cash acquired
Sale of investments
Dividends received
(73)
790
131
(13)
46
(48)
927
140
Net cash received from investing activities
848
33
1,019
Net cash inflow/(outflow) before financing
activities
1,176
(171)
14
(232)
(40)
(470)
(76)
Consolidated statement of cash flows
For the six months ended 31 March 2023
Note
Cash flows from operating activities
Cash generated from / (expended) by
operations
Income tax credits received
Net cash inflow/(outflow) from operating
activities
Cash flows from financing activities
Principal paid on lease liabilities
Interest paid on lease liabilities
8
(241)
(33)
Repayment of bank loans
Interest paid
(125)
(22)
-
(83)
(19)
(6)
Net cash outflow from financing activities
(421)
(278)
(648)
Net change in cash and cash equivalents
755
(449)
(634)
(204)
592
515
(81)
(15)
515
(85)
(204)
Cash and cash equivalents are comprised of:
Cash at bank and in hand
Cash held within assets classified as held for sale
Secured bank overdrafts
805
(213)
38
28
(81)
28
(232)
Cash and cash equivalents at end of year
592
(15)
(204)
Cash and cash equivalents at start of period
Currency translation differences
Cash and cash equivalents at end of period
41
10
Consolidated statement of changes in equity
For the six months ended 31 March 2023
Share
capital
Retained
earnings
£'000
Foreign
currency
translation
reserve
£'000
Merger
reserve
Total
Non
controlling
interests
Total
equity
1,652
(557)
(3,364)
1,494
£'000
£'000
£'000
£'000
1,176
401
-
401
-
-
(484)
-
-
(484)
-
(484)
-
33
-
-
-
33
-
33
-
33
-
-
(451)
-
(451)
Issue of ordinary shares
in relation to business
combination
1,101
-
-
-
1,708
2,809
-
2,809
At 31 March 2023
2,753
(524)
(3,848)
1,494
2,884
2,759
-
2,759
Retained
earnings
Other
distributable
reserve
Merger
reserve
Total
Non
controlling
interests
Total
equity
£'000
Foreign
currency
translation
reserve
£'000
£'000
£'000
£'000
£'000
1,652
(173)
(1,082)
1,494
1,176
3,067
-
3,067
Loss for the period
Other comprehensive
income
-
-
(387)
-
-
(387)
-
(387)
-
(49)
-
-
-
(49)
-
(49)
Total comprehensive loss
-
(49)
-
-
(436)
-
(436)
At 1 October 2022
Loss for the period
Other comprehensive
income
Total comprehensive
profit/(loss)
£'000
Other
distributable
reserve
£'000
(484)
For the six months ended 31 March 2022
Share
capital
At 1 October 2021
£'000
(387)
£'000
At 31 March 2022
1,652
(222)
(1,469)
1,494
1,176
2,631
-
2,631
Retained
earnings
Other
distributable
reserve
Merger
reserve
Total
Non
controlling
interests
Total
equity
£'000
Foreign
currency
translation
reserve
£'000
£'000
£'000
£'000
£'000
1,652
(173)
(1,082)
1,494
1,176
3,067
-
3,067
Loss for the period
Other comprehensive
income
-
(384)
(2,282)
-
-
-
(2,282)
(384)
-
(2,282)
(384)
Total comprehensive loss
-
(384)
(2,282)
-
-
(2,666)
-
(2,666)
1,652
(557)
(3,364)
1,494
1,176
401
-
401
For the year ended 30 September 2022
Share
capital
At 1 October 2021
At 30 September 2022
£'000
£'000
Notes to the Interim Report
1
Basis of preparation
The financial information presented in this Interim Report has been prepared in accordance with the
recognition and measurement principles of international accounting standards in conformity with the
requirements of the Companies Act 2006 that are expected to be applicable to the financial
statements for the year ending 30 September 2023 and on the basis of the accounting policies
expected to be used in those financial statements.
2
New accounting standards, amendments and interpretations applied
A number of new or amended standards and interpretations to existing standards became applicable
for the current reporting period. The Group did not have to change its accounting policies or make
retrospective adjustments as a result of adopting these standards.
3
Business combination
On the 20 March 2023 the Group acquired 100% of the voting equity instruments in Torpedo Factory
Group Limited, an audio visual and stage technology provider to organisations in the UK and Europe.
Consideration for the acquisition comprised:
i)
110,142,286 Ordinary Shares in Aukett Swanke Group Plc at an issue price of 2.55p based on
the closing price of Aukett Swanke Group Plc shares on 1 March 2023.
ii)
Up to 3,631,124 additional consideration shares proposed to be issued to participating TFG
Option Holders, at an issue price of 2.55p.
iii)
8,400,000 share options in Aukett Swanke Group Plc exercisable at 1p. Fair value calculated
at 1.55p per share based on the closing price of Aukett Swanke Group Plc shares on 1
March 2023.
Shares in Aukett Swanke Group Plc
Maximum number of additional consideration shares to be
issued to the participating option holders
Share options in Aukett Swanke Group Plc
Total acquisition cost
£'000
2,809
92
130
3,031
The fair values of the identifiable assets and liabilities acquired have only been provisionally
determined and are subject to adjustment during the measurement period.
Goodwill
Property, plant and equipment
Right-of-use assets
Other intangible assets
Loans and other financial assets
Inventories
Contract assets
Trade and other receivables
Net cash
Assets
Provisional
20 Mar-23
£'000
1,381
3,122
324
75
162
336
10
1,526
790
7,726
Trade and other payables
Contract liabilities
Interest bearing loans and borrowings
Lease liabilities
Deferred tax liability
Liabilities
1,180
654
2,611
320
152
4,917
Total net assets
2,809
Property, Plant and Equipment includes £3,020k net book value of freehold property, being the Old
Torpedo Factory building in London, last revalued in July 2021.
Acquisition relat
Share your feedback
Discover